Project Background and Challenges
The expanded San Francisco Museum of Modern Art (SFMOMA), designed by lead architect Snøhetta, opened last month. The 10-story steel-framed structure stands 210 feet above the adjacent streets.

Originally designed in 1991, the museum’s foundation system consisted of a relatively thin mat that extended beyond the structure’s limits to support a future seven-story expansion. Two decades later, expansion plans revealed that the museum needed more space than originally planned.

The expansion combines the existing mat foundation with the new foundation. The project also added a basement, which required a 30-foot-deep excavation in a heavily dense urban area.

Langan faced the following geotechnical challenges:

  • Differential settlement between the existing and new foundations
  • Temporary support of the adjacent 32-story W Hotel during the planned excavation for the new basement
  • Weak and potentially liquefiable soil underlying the new mat foundation
  • Presence of relatively thick deposit of moderately compressible soil
IMG_3865r1-blog

Construction at the SFMOMA site.

Our Solutions
Langan was a key member of the project team, working closely with Magnusson Klemencic Associates (project structural engineer) and Webcor Builders (project general contractor). As the geotechnical, earthquake, and environmental engineers, we developed performance-based seismic design criteria and foundation solutions so the project could move forward.

To address the geotechnical challenges, we recommended deep soil-cement mixing (DSM) to improve the ground beneath the new basement and provide temporary shoring. The objective of the ground improvement was to: (1) reduce the potential for liquefaction, (2) reduce the potential for disturbing the weak underlying soils during construction, and (3) transfer building loads to deeper competent layers.

The DSM panels provided appropriate subgrade bearing for the mat and brought the anticipated differential settlement to acceptable levels. For the original mat foundation, MKA developed a system of stiff shear walls through the basement to spread heavy column loads to meet Langan’s geotechnical and foundation design criteria. This structural system not only supported the original mat without overstressing it, but it also allowed the structural connection to the new mat foundation.

SFMOMA - 1213

SFMOMA reopened in May 2016. The transformed museum, with its new (white) addition visible behind the distinctive original building, has twice the amount of exhibition space as before. (Credit: Michael Layefsky)

For the required 30-foot-deep excavation, we developed geotechnical design criteria for a stiff soldier beam and raker system to support the neighboring 32-story W Hotel. Ground improvement was also used to strengthen and stiffen the subgrade soil supporting the shoring. Small measured excavation-induced displacements confirmed the success of this approach.

With our interactive solution-oriented approach with the design and construction teams, we overcame project challenges. The majestic SFMOMA is a testament to our innovative and adaptable foundations systems.

Answer provided by Scott Walker, PE, GE, Associate
Scott has over 17 years of experience in providing geotechnical investigation, design, consultation, earthquake engineering, and construction observation services for projects throughout California and southwestern Montana. He specializes in providing innovative geotechnical solutions to challenging sites. His experience includes: commercial and residential buildings, high-rises, sports facilities, museums, schools, and resort development.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s